• Home
  • About Us
  • SIS & FSM Consultancy
    • SIS & Functional Safety
    • HARA
    • LOPA
    • HAZOP
    • Safety Requirements Specification
    • SIL Calculations / SIL Assessments
    • Functional Safety Assessments
    • SIS Design & Implementation
    • Replacement of Legacy Safety Systems
  • FAQ’s
  • Contact
T: +44 (0)1792 897 002
Get in touch
  • Home
  • About Us
  • SIS & FSM Consultancy
    • SIS & Functional Safety
    • HARA
    • LOPA
    • HAZOP
    • Safety Requirements Specification
    • SIL Calculations / SIL Assessments
    • Functional Safety Assessments
    • SIS Design & Implementation
    • Replacement of Legacy Safety Systems
  • FAQ’s
  • Contact

SIS & Functional Safety Management Consultancy T: +44 (0)1792 897 002

What are the requirements of the standards IEC 61508 / IEC 61511 in relation to the SIS life-cycle?

10th April 2018

A

What are the requirements of the standards IEC 61508 / IEC 61511 in relation to the SIS life-cycle?

IEC61508/IEC61511 requires that FSAs should be undertaken on a periodic basis as well as key stages in the SIS lifecycle by independent, competent person(s), department(s) or organisations.

C&P SIS & Functional Safety Management Consultancy
1A Sandringham Park, Llansamlet,
Swansea, SA6 8PW
T: +44 (0)1792 897002 F: +44 (0)1792 895193
E: info@cpengineering.co.uk
Useful Links
  • Home
  • FAQ’s
  • About Us
  • Contact

Company Registration No. 1140574
Employment Agency No. W077
All content copyright © C&P Engineering Services 2026

Website by Pentagon